It has been almost a week since I did all of this but my second day was more interesting than the first. I worked with John and we had to take a cart of PC's and go redeploy them around the campus. Our first stop was to go to the VC and near the area where you can rent things like a basketball and the stairs to go to the second area we had to setup the two kiosk PC's there. It took a while to get them back onto the right domain for the school, but eventually both worked. After that we headed back down near the campus server rooms. In the back of the server room area with the tape backups and the huge UPS's, was an office and the owner of that computer was having an issue with viruses and malware. We found that whatever is on it was keeping Sophos from installing so it was decided that that PC would have to be pulled and a loaner given. In another area near the server room we had a computer that was to go back to its owner and we would take the loaner computer from them. We just had to swap the original HDD back into the original computer and take the loaner with us. The last thing we did before I left was to give somebody back their monitor, which was not needed since all the people had dual 24 inch setups, but for the purpose of the Tangent systems on loan they had to be complete.
No comments:
Post a Comment